People
Who owns this decision, who is affected by it and who has to live with the result? If the answer is a team rather than a person, who speaks for the team when the decision is questioned?
Learn
I use these questions when an AI system has produced a confident answer and someone still has to decide what to do with it. They are for a working meeting, not for a policy document. You can copy them into your own notes and change the wording to suit your team.
I treat people, process and data as complementary questions. They are not stages in a method, and you do not finish one before starting the next. A clear answer on one can hide a gap in another, which is why I ask all three about the same decision.
Who owns this decision, who is affected by it and who has to live with the result? If the answer is a team rather than a person, who speaks for the team when the decision is questioned?
How does the decision move from a recommendation to an approval? Who checks the work before it is acted on, and what would make someone stop it?
What evidence does the recommendation rest on, what is missing and what has been assumed? A number can be accurate and still not answer the question you asked.
For further reading, AIR APAC, the institution I founded, publishes articles and a field guide for managers. Use them alongside the prompts below.
Each block below can be selected and pasted into a document or a chat. Answer the prompts about one real decision rather than a hypothetical one.
Free editable text files. Open one in your notes or word processor, add your answers and share it with your team. No email required.
What is the decision, in one sentence? Who owns it? Who is affected, and who has to live with the result? Who can stop it?
What is the recommendation, in one sentence? What else was considered? Why was each alternative rejected? What would change the recommendation?
Where did the figures come from? Which assumptions does the conclusion depend on? What is missing or unverified? How confident are we, and why?
Who prepares the recommendation? Who checks it? Who approves it? What is recorded, and who is accountable if it is wrong?
What will we measure? When will we review it? What result would tell us to reverse the decision? Who reviews, and by when?
This exercise is fictional and the figures are illustrative. They are not client results. Try it with a colleague before comparing your answers.
An AI system recommends replacing a supplier to save US$12,000 a year. The transition is expected to cost US$8,000. Review and support are expected to cost US$6,000 a year.
Replace the supplier. The AI estimates a saving of US$12,000 a year.
Consider the replacement only after checking service quality and continuity, and if the transition cost stays at US$8,000, review and support stay at US$6,000 a year, and we accept that the first year costs US$2,000 more than we spend now. Revisit at twelve months, when the saving would be US$6,000 a year if the assumptions hold.
In the first year the cost is US$14,000 against a saving of US$12,000, so the first-year cost rises by US$2,000. In later years the saving would be US$6,000 a year if the assumptions hold. The point of the exercise is not the arithmetic. It is the conditions attached to the approval.
I wrote about these questions in what a board should ask and in when it is right to automate a decision.
Process and data tools
Use these alongside the worksheet. Bring the people who prepare, check and approve the work into the same conversation.
Request and intended result: Inputs and their sources: Steps, handoffs and waiting time: Where AI contributes: Human check and reason to stop: Approval owner: Result to measure and review date:
Mark the bottleneck. Ask whether a faster AI step changes the whole workflow or simply moves the queue.
The figures below are illustrative, not measured client results. Try the question before reading the comparison.
A draft takes 30 minutes, then waits 960 working minutes for approval. AI cuts drafting to two minutes. What changed for the person waiting for the result?
The total falls from 990 to 962 working minutes: 28 minutes saved. The approval queue still dominates. Ask the approver what causes the wait before adding more drafting capacity.
Measure request-to-approval time, rework and the quality of the final decision. Name the person who can change the handoff.
In a pilot of 20 cases, work falls from eight to five minutes per case. The headline is 60 minutes saved. Correcting errors then takes another 45 minutes. What should you report?
The net time released is 15 minutes across those 20 cases. Record the correction work and sample size beside the headline. Check whether the cases represent the wider workload before projecting a yearly figure.
Time released is capacity, not automatically a cash saving. Ask how the team will use it and what operating result should improve.
See these questions in context in the four applied work examples.
Continue reading
Start with what a leader owes the people who must change, then what happens when a team stops checking.
Start with why speed is not the same as progress, then a pilot that worked.
Start with reports on AI use and how people decide, then ask how people decided.
Start with what a board should ask, then when it is right to automate a decision.
Read the free introduction and first two chapters of The Human Layer, then bring a decision back to the worksheet. AIR APAC also offers a free open programme with four written lessons and a practice decision; its videos are still being recorded.
For new writing, follow the full-text RSS feed or my LinkedIn posts.
Bring a decision your team is facing and we can test it against these prompts. The aim is to leave with the conditions written down.